An interdisciplinary team of nine students, along with four faculty and staff from my department and UB production group. UB was the ninth university since 1987 (eight of which were AAU institutions) to be honored by hosting the build of the entries, however we were the first without an active MFA program in theatre design or technology. After revisions, feasibility studies, prototypes, and planning, the exhibits were fabricated in roughly 3,500 working hours during the 2018-2019 school year.
National Exhibit Cost Estimate.
PQ Nat Cost Out Full.pdf
Selected build drawings from the National Exhibit.
NATIONAL FLOOR STRUCTURE 11-19-18.pdf
Process pictures from build and load in of the National Exhibit.